This is the second of a series of caches along the Chisholm Trail, a foot and cycle path connecting various parts of Cambridge, including Fen Ditton, the River Cam and Perne Road. Phase 1 of the trail was only recently completed in November 2020, with the second and final phase not being completed y…
Gridsquare: JJ00AA00AA, Latitude: 0.000000, Longitude: 0.000000
Cache Type: GeoCache, Difficulty: Easy, Terrain: Handicapped accessible
0